top of page
Whatsapp

Implant Placement Surgery for Tooth #47

Implant Placement
Implant Placement
Implant Placement Surgery for Tooth #47

Chief Complaint

Patient requires replacement for the missing tooth #47.

Clinical Findings

Missing tooth #47

Treatment Plan

  • Discussed risks, procedures, and alternatives for replacing tooth #47

  • Pre-operative CBCT reviewed

  • Patient understood and agreed to proceed

  • Informed consent obtained for implant placement surgery on the #47 site

Pre-operative Assessment

Anesthesia

LA block: right inferior dental nerve (IDN), lingual nerve (LN), and long buccal nerve (LBN)

Surgical Procedure

  • Patient cleaned and draped

  • Incision made, buccal flap raised

  • Implant site prepared

  • Mid-operative CBCT taken to confirm implant position and alignment of the preparation

  • Final preparation of the implant site after confirming alignment

  • 5.0mm x 8.0mm Dentium Superline II implant placed

  • 6.5mm (small) healing abutment placed

  • Occlusion checked

  • Bioactive synthetic scaffold (BSS) placed x4 for primary closure

  • Hemostasis achieved, post-operative instructions given

Post Operation Gallery

Add a Title
Add a Title
Add a Title
Add a Title
Add a Title
Add a Title

Post-operative Assessment

bottom of page