Implant Surgery for #15, #16

Implant Placement
Implant Placement
 Implant Surgery for #15, #16

Chief Complaint

Patient has missing teeth at positions #15 and #16 and seeks replacements.

Clinical Findings

  • CBCT reviewed and implant positions planned.

  • Ridge split required at the #15 site.

  • Risks, procedures, and replacement alternatives explained to the patient.

Treatment Plan

Proceed with ridge split, placement, and bone grafting surgery for implants at sites #15 and #16.

Pre-operative Assessment

  • Informed consent obtained for implant placement with ridge splitting and bone grafting at #15 and #16 sites.

  • Patient is in agreement with the procedure and understands the risks involved.

Anesthesia

Local anesthesia (LA) administered.

Surgical Procedure

  1. Patient cleaned and draped.

  2. Incision: Buccal flap raised.

  3. Drilling: Pilot drilling for #15 and #16 implant positions.

  4. Ridge Preparation: Ridge prepared and widened using a surgical blade, mallet, and osteotomes.

  5. Implant Site Preparation: Sites prepared with respective sized drills.

  6. Implant Placement:4.0mm x 10.0mm Dentium Superline III implant placed at #15 site; healing abutment 5.5mm (S) placed.
    4.5mm x 10.0mm Dentium Superline III implant placed at #16 site; healing abutment 6.5mm (S) placed.

  7. Bone Grafting: 1.0 cc EthOss artificial bone grafting material used.

  8. Closure: Flap released and BSS x 10 placed for primary closure.

  9. Haemostasis and Post-Operative Instructions: Ensured and provided to the patient.

Post Operation Gallery

Add a Title
Add a Title
Add a Title
Add a Title
Add a Title
Add a Title

Post-operative Assessment

  • Informed consent obtained for implant placement with ridge splitting and bone grafting at #15 and #16 sites.

  • Patient is in agreement with the procedure and understands the risks involved.